Place · consortium dossier
Iguazú AI City
Also: Yguazú AI campus, Araico and Crusoe campus.
What is announced for a compute campus at Yguazú, Alto Paraná, and what a press account says was contracted for power. The announced size and the contracted ramp are different quantities. Newspaper accounts are not treated as the contract.
As of 22 November 2026. Written by the consortium. Pen name, where a name is required: Wang Lei.
Entity page: Iguazú AI City.
Claims
- [V-s]
RDN reported on 24 October 2026 that the Paraguayan developer Araico is building Iguazú AI City at Yguazú, Alto Paraná, with the US firm Crusoe, and that the project is billed as 1.3 GW and US$12 billion. The November edition labels that report [V]. This dossier does not. A newspaper account of a billing is not the project contract.
- [V-s]
ABC Color and Hoy reported on 23 October 2026 that the state utility ANDE signed a 15-year supply contract with Kuntur S.A. on 22 October. As those papers report it, supply starts at 6 MW on 1 December 2026, rises to 146 MW in April 2028 and reaches 286 MW in April 2029, at about US$48.91 per MWh at 220 kV and US$56.39 per MWh at 23 kV. The November edition labels those reports [V]. The contract itself was not obtained for this page, so the figures stay secondary.
- [V-s]
RDN reports that under the Itaipu treaty only ANDE and Brazil's ENBPar can buy the dam's output, and describes the chain as Itaipu to ANDE to the campus. That institutional chain is the paper's account. It is not a copy of the treaty text.
- [V-s]
The 1.3 GW figure in the project billing and the 286 MW maximum in the reported supply ramp are not the same quantity. Using the press figures as reported, the contracted ramp at its highest step is a fraction of the billed campus.
What this does not show
- No link is shown between this campus and the resolution of a Paraguayan bank. The November edition says none has been shown, and this page does not add one.
- A billed capacity is not electricity delivered, and a press account of a tariff is not the signed contract.
Open
- [U] The ANDE contract, the water and cooling licence from the environment ministry, the ownership of Kuntur S.A., and any DFC or IDB Invest amounts.