Organization · consortium dossier
ANEEL
Also: ANEEL, Transmission Auction 4/2026.
Transmission Auction 4/2026 as the regulator and the exchange reported it. Nationality of the winners is kept at the grade of the press, except where a company filing states the owners.
As of 22 November 2026. Written by the consortium. Pen name, where a name is required: Wang Lei.
Entity page: ANEEL.
Claims
- [V]
ANEEL's notices say Transmission Auction 4/2026 was held at B3 on 30 October 2026, that all eight lots were awarded, and that the auction carried about R$8.9 billion of planned investment and 1,866 km of new lines in seven states. B3's notice reports five winners and contracted investment of R$8.9 billion.
- [V]
ANEEL's lot notice says lot 4, a 500 kV system across Paraná and Mato Grosso do Sul, went to Celeo Redes Brasil at an allowed annual revenue of R$377.1 million, 50.55 percent below the regulator's cap.
- [V]
Celeo Redes Brasil's own filing for the quarter ended 31 March 2026 states joint control by Spain's Elecnor, 51 percent, and the Dutch pension investor APG, 49 percent.
- [V-s]
The November edition says groups of Spanish origin took seven lots, naming Celeo, Cymi, Neoenergia and Cox, and that Portugal's EDP took the eighth. It labels that grouping [V-s]. It also labels as secondary the report of an average discount of about 50 percent and of Axia, the former Eletrobras, bidding and winning nothing. Those points stay secondary.
- [V-s]
The edition reads the awards as 30-year regulated concessions, with revenue fixed at auction and paid by grid users through tariffs, not as sales of the grid. That legal character is the edition's reading of the concession model.
What this does not show
- Planned investment is the auction's capex estimate. It is not money already spent.
- A discount to the allowed-revenue cap lowers the tariff path. It does not identify the lenders.
Open
- [U] The share of each winner's capital that is foreign, beyond Celeo's filing.
- [U] Whether BNDES financed any of the eight lots.