November 2026
Open checks
- Whether the Atmos experimental-lot contract has been signed since the cancelled 27 October ceremony; receipts before 2023 for the four suppliers above. [U]
- The R$5bn "laundered in bets" claim: no primary police or prosecutor source has been found. [U]
- Claims about sponsors of Otto Lobo's reappointment, dismissals of superintendents and weakened internal controls at the CVM (single column, not independently confirmed). [U]
- Prediction-market errors on Brazil's election and the risk for the US vote (Bloomberg Línea, 28 Oct; not yet read). [U]
- Planalto texts of Laws 12.683/2012, 12.850/2013 and 12.846/2013; the DOJ Odebrecht plea release; the foreign share of construction after 2015. [U]
- ANM titles for each rare-earth deposit; whether the critical-minerals council reviews the Serra Verde and Meteoric takeovers. [U]
- Gerdau: whether the material came from a new tailings pile (Gerdau says it is not yet operating); FEAM/SEMAD inspection report; water sampling. [U]
- Uruguay: CMEC contract value and financing; whether the project counts as Belt and Road. [U]
- Minas-Rio: whether any of the named prospects files a bid; Concremat's ownership against company filings; the capital origins of bidders, once filed. The notice itself has been read for the three contract terms above. [U]
- Copper: the identity of Paranapanema's new controlling shareholder; the per-tonne currency effect against Vale's 20-F cost base; an ICSG forecast. [U]
- COP30: the deforestation roadmap's finance figures; ANP's official sixth-cycle results; Petrobras's Equatorial Margin exploration budget for 2026–30. [U]
- Concessions: how many of the 2027 auctions are held on schedule, given high interest rates. [U]
- The TREO grade of Serra Verde's 2025 MREC, which would be needed to convert the 679 t customs gross into oxide equivalent and to reconcile it with SVRE's 138 t TREO sold and US$2.5m of revenue (against US$12.0m FOB in customs). [U]
- Whether the October–November 2026 MREC shipments to US SIIE appear in November or December Comex Stat, and which plant will actually separate those first cargoes. The intended path (SPV on-sale; USAR US plant by early 2028, then Carester) is disclosed. [U]
- The named counterparties to Sigma's 2026 offtake agreements: not disclosed in the 6-Ks or MD&A reviewed. [U]
- A complete census of heading 2530.90.90 from Minas Gerais in 2026: most of the volume is consistent with Sigma's fines sales, but the heading is a basket and 300,000 t of inventory remained unsold at the plant in the first quarter. [U]
- Why S&P Global, citing the trade ministry on 8 January 2026, printed 125,636 t of 2025 spodumene when the current official API and UN Comtrade support 111,690 t under 2530.90.10 (the FOB values match). Treat as a superseded extract; the official current number stands. [U]
- Consignees for the 2615.90.00 shipments to Thailand and Germany. Taniobis is a contractual fit for AMG's Mibra output, not a proof from the customs record; Rondônia is a second origin. [U]
- The residual 14 t of lithium carbonate declared to China in October 2026, after the May–July bulge and after CBL's early-October statement that it had stopped exporting chemicals. [U]
- Why China reports no HS 2825.20 imports from Brazil in Comtrade when Brazil reports 161,088 t of exports, and why China's CIF value for HS 2846.90 (US$2.4m) is so far below Brazil's FOB (US$12.0m) despite matching volumes. [U]
- Why the entire Alagoas copper-sulphide-concentrate heading is as large as the official figures (114,917 t / US$225.5m in 2025; 84,511 t / US$234.4m in January–October 2026). Mineração Vale Verde states that its Serrote mine at Craíbas, Alagoas, exports copper concentrate, with nameplate capacity of about 84.5 kt of concentrate a year [V] (Mineração Vale Verde). The 2025 official mass exceeds that nameplate, so a one-to-one identity of the heading with that mine is not proven. [U]